Archive documents

The Development Consent Order application documents were submitted on 3 August 2018.

All the documents from the Development Consent Order application are available to view and download from the document library page, and from the Planning Inspectorate’s website.

Archive documents

 

Stage 2a Consultation

Stage 2 Consultation

Stage 2 Technical Documents

Stage 2 Maps, Drawings and Plans

The following documents are all draft documents which will be consulted upon as part of the Stage 2 Consultation and which will form part of the application to be submitted to the Planning Inspectorate.(2.2) Works Plans
(2.3) Access and Rights of Way – Key Plan
(2.3) Access and Rights of Way – Sheet 1
(2.3) Access and Rights of Way – Sheet 2
(2.3) Access and Rights of Way – Sheet 3
(2.4) Order Limits Plan – Key Plan
(2.4) Order Limits Plan – Sheet B
(2.4) Order Limits Plan – Sheet C
(2.4) Order Limits Plan – Sheet D
(2.4) Order Limits Plan – Sheet E
(2.5) Parameter Plan – Development Zone Plan – Key Plan
(2.5) Parameter Plan – Development Zone Plan – Sheet B
(2.5) Parameter Plan – Development Zone Plan – Sheet C
(2.5) Parameter Plan – Development Zone Plan – Sheet D
(2.5) Parameter Plan – Development Zone Plan – Sheet E
(2.6) Parameter Plan – Floor Levels & Height Plan – Key Plan
(2.6) Parameter Plan – Floor Levels & Heights Plan – Sheet B
(2.6) Parameter Plan – Floor Levels & Heights Plan – Sheet C
(2.6) Parameter Plan – Floor Levels & Heights Plan – Sheet D
(2.6) Parameter Plan – Floor Levels & Heights Plan – Sheet E
(2.7) Parameter Plan – Green Infrastructure Plan – Key Plan
(2.7) Parameter Plan – Green Infrastructure Plan – Sheet B
(2.7) Parameter Plan – Green Infrastructure Plan – Sheet C
(2.7) Parameter Plan – Green Infrastructure Plan – Sheet D
(2.7) Parameter Plan – Green Infrastructure Plan – Sheet E
(2.8) Illustrative Masterplan – Key Plan
(2.8) Illustrative Masterplan – Sheet B
(2.8) Illustrative Masterplan – Sheet C
(2.8) Illustrative Masterplan – Sheet D
(2.8) Illustrative Masterplan – Sheet E
(2.9) General Arrangement – Key Plan
(2.9) General Arrangement 101
(2.9) General Arrangement 102
(2.9) General Arrangement 103
(2.9) General Arrangement 104
(2.9) General Arrangement 105
(2.9) General Arrangement 106
(2.9) General Arrangement 107
(2.9) General Arrangement 108
(2.9) General Arrangement 109
(2.9) General Arrangement 110
(2.9) General Arrangement 111
(2.10) Highway Works – Key Plan
(2.10) Highway Works – Sheet 1
(2.10) Highway Works – Sheet 2
(2.10) Highway Works – Sheet 3
(2.11) Traffic Regulation Plan – Key Plan
(2.11) Traffic Regulation Plan – Sheet 1
(2.11) Traffic Regulation Plan – Sheet 2
(2.11) Traffic Regulation Plan – Sheet 3
(2.12) Speed Limits Plan
(2.13) Highway Classification – Key Plan
(2.13) Highway Classification – Sheet 1
(2.13) Highway Classification – Sheet 2
(2.13) Highway Classification – Sheet 3
(2.14) Rail interchange illustrative general arrangement
(2.15) Rail interchange illustrative phase 1 layout
(2.15) Rail interchange illustrative phase 2 layout
(2.16) Long Sections Railway Alignment
(2.16) Cross Sections Railway Alignment Sheet 1
(2.16) Cross Sections Railway Alignment Sheet 2
(2.17) Parish Boundaries Plan – Key Plan
(2.17) Parish Boundaries Plan – Sheet B
(2.17) Parish Boundaries Plan – Sheet C
(2.17) Parish Boundaries Plan – Sheet D
(2.17) Parish Boundaries Plan – Sheet E
(2.18) Proposed Bridge Plans – Location Plan
(2.18) Proposed Bridge Plans – Rail Sidings
(2.18) Proposed Bridge Plans – WCML
(2.18) Proposed Bridge Plans – Staffs & Worcs Canal

December 2016 update

Since the end of Stage 1 Consultation we have focused on options for the potential layout of the SRFI. We have updated our illustrative masterplan to show our progress since June 2016. More information about this update can be found here.December 2016 Illustrative Masterplan

Stage 1 Consultation – Consultation Documents

 